About this project
engineering-manufacturing / industrial-design-1
Open
Project overview
Once the project is won, a document is sent with all the detailed specifications of the requirement, 24 hours later a Kick off meeting is scheduled. The first objective is to design a conceptual sketch + a powerpoint presentation. Once accepted, we begin with the detailed industrial design, which will have 2 final reviews (internal review and review with the client) before starting with the engineering plans. English language isn´t required
Category Engineering & Manufacturing
Subcategory Industrial design
What do you need? New design from scratch
Is this a project or a position? Project
Required availability As needed
Delivery term: May 18, 2024
Skills needed