Evaluating bids

Ccm Bombas de redn de incendio

Published on the September 24, 2023 in Engineering & Manufacturing

About this project

Open

Necesito diseñar un ccm para 3 bombas de incendio. 2 son de 30 hp, q de 5 hp. Debe contar con señalizacion de linea, marcha, y parada de emergencia

Category Engineering & Manufacturing
Subcategory Industrial design
What do you need? New design from scratch
Is this a project or a position? Project
Required availability As needed

Delivery term: Not specified

Skills needed

Other projects posted by L. M. B.