Evaluating bids

Transferring porject or production from one location to another

Published on the November 01, 2020 in Engineering & Manufacturing

About this project

Open

1. Conduct an npi/npd until mass production within the expectation and budget.
2. Successfully increase the dle & dlu (efficiency & utilization of dl) from 63% to 85% with muda concept and cascade to operator level.
3. Spearheaded the “engineer build first coaching operator second” implementation in Flex project with 1-time PVT passing approved by the customer.

Category Engineering & Manufacturing
Subcategory Other
Project size Medium
Is this a project or a position? Project
Required availability As needed

Delivery term: Not specified

Skills needed