Tpi Inspection by Freelance

Published on the September 24, 2015 in Engineering & Manufacturing

About this project

Open

Hola,

Tengo solicitud de un Cliente para una expeditación de Transformadores en guadalajara (jalisco) con los detalles a continuación:

the expediting visit  will should realize on september 30th.

The visit will consist in the evaluation of project status and intends to verify and check step by step the progress of the contract, that means the following phases:

1. Engineering - document of reference: PPP (list of the documents that are part of the Detailed Design)

2. Procurement - document of reference: Procurement Plan

3.
Construction - document of reference: Time Schedule

4. Expediting & Inspection - document of reference: Inspection and Test Plan, QCP