Evaluating bids

Building and Roads

Published on the June 08, 2023 in Engineering & Manufacturing

About this project

Open

Worked in Orange Line Metro Train (Package – 2) Project.
Worked at Signal Free junction Chungi & Qainchi, Lahore (Package 1, 2 & 3) .
Worked at PKLI Project .

Category Engineering & Manufacturing
Subcategory CAD drawing
What do you need? Create a new file from a sketch or another format
Is this a project or a position? Project
Required availability As needed

Delivery term: Not specified

Skills needed

Other projects posted by A. S.